Check approvals before generating electricity

Understand grid connection, ERC notifications, building requirements and export contracts.

The answer first

Grid-connected systems must follow utility requirements even when installed for self-consumption. Energy and building notifications or permits depend on the project. Have the responsible party document the required steps and approval evidence.

Separate the paperwork into three areas

Check PEA/MEA grid connection, ERC energy notifications or licensing, and local building/structural requirements. Exemption from one license does not exempt the project from every requirement.

  • State in the contract who submits documents and pays fees.
  • Check approval status and the authorized party against the actual installation.
  • Obtain design and inspection records before operating under the applicable conditions.

Installing panels does not automatically grant export rights

The existing 2026 MyEnergy research snapshot describes surplus purchase at 2.20 THB/kWh for 10 years with offered export capacity up to 5 kW per meter. Verify current eligibility, quota and your own contract. Export revenue is disabled by default in the calculator.

Recheck before adding panels or batteries

Expansion or equipment changes can affect approved designs and existing contracts. Notify the utility before proceeding. Do not cancel an existing export agreement merely to seek a new scheme without checking eligibility.

Supporting sources

  1. PEA — Generation system connection application ↗
  2. MEA — MyEnergy and electricity purchase announcements ↗
  3. ERC — Licensing and notifications ↗
  4. PEA — Solar rooftop standards and safety ↗

General information for questions and preliminary estimates. Site and contract conditions need individual verification. International sources explain principles, not Thai law.